ELECTRICITY DEPARTMENT

SERVICES RENDERED

The Electricity Department provides the following services to the people of Union Territory of Puducherry. According to their needs, the public can approach the concerned for availing Services/Particulars in the Electricity Department.

    (a) Availing of new service connection to domestic, Commercial, Industrial and agriculture.
    (b) Name transfer and shifting of service connection.
    (c) Enhancement of load.
    (d) Rectification of defective meter.
    (e) Change of tariff.
    (f) Revision/conversion of current consumption charge bill.
    (g) Issue of Power Feasibility Certificate.
    (h) If any defects found in distribution of power is to be rectified.
    (i) New street lights to be installed on the basis of Municipalities or Commune Panchayats resolution.
  *(j) Intimation of appropriate action taken on the petitions received from the public.
**(k) Hearing and readdressal of public grievances and rectification of the complaint.

Apart from the above services, the services (j) and (k) rendered by this Department are as detailed below:-

 * If the public have addressed their grievances/petitions to the Superintending Engineer-I or Post Box No. 333, Electricity Department, Puducherry the particulars regarding the action on the petition is available from the Public Relation Officer at the I floor, Room No. 102 New Building , Electricity Department, Puducherry.

** Apart from the above services, if the public requires any particulars/services, they can approach the "Information Centre" which is exiting near the entrance at Main office.


The Electricity Department is divided into three Circles and functioning under the administrative control of Superintending Engineer-I as Head of Department. The jurisdictional area and address of the three Superintending Engineers are given below:-

(a) Superintending Engineer-I
Electricity Department (Main Office)
137, Subbash Chandra Bose Salai
Puducherry- 605 001
Overall Administration (whole Union Territory of Puducherry) 
(b) Superintending Engineer-II
Electricity Department (Main Office)
137, Subbash Chandra Bose Salai
Puducherry- 605 001
Operation and maintenance of Karaikal, Mahe and Yanam region.
(c) Superintending Engineer-III
Electricity Department (Main Office)
137, Subbash Chandra Bose Salai
Puducherry- 605 001
Operation and Maintenance of Puducherry region.

 

The Public of Puducherry region who encounter any delay in redressal of their grievances may approach the Superintending Engineer-III at the above mentioned address for Salvation. The public living in  Karaikal, Mahe and Yanam regions may approach the Superintending Engineer-II at the above mentioned address for salvation of their long pending problems. For the entire U.T. of Puducherry, the public may approach the Superintending Engineer-I.


EXECUTIVE ENGINEER-I (TOWN)

137, Subbash Chandra Bose Salai
ELECTRICITY DEPARTMENT
NEW BUILDING, II FLOOR
Puducherry
Phone :      Office : (0413) 233 9543     

The following Subdivision Offices and the respective jurisdictional areas under the control of Division-I are detailed below.  The public residing in the below mentioned area can approach their concerned Officers for availing of different services rendered by this Department. Besides the public may also contact the respective Fuse-off Call Office either in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Executive Engineer / Town-I
Electricity Department (MainOffice)
137, Subbash Chandra Bose Salai
Puducherry - 605 001.
Phone Office: 233 6361-65 & 222 2270 - 74 Extn: 526
Phone Residence: 220 0960
(i) Fuse-off Call Office : Town South
Phone : 233 6361-65 & 222 2270-74
Extn: 527

From Kandappa Mudali Street to Subbaiah Salai which includes Vanarapet, Kolas Nagar, Nethaji Nagar, Vambakeerapalayam, Dubrayapet.

(ii) Fuse-off Call Office: Town North
Phone: 233 6327

From Perumal Koil Street to Chinnayapuram, Thiruvalluvar Nagar, Vazhaikulam, Vaithikuppam, portion of White Town (From Rangapillai Street to S.V.Patel Salai).

(iii) Fuse-off Call Office: Town Central
Phone: 233 6327

From Needarajappaiyar Street to Muthumariamman Koil Street.

(iv) Fuse-off Call Office: Town South-Central
Phone: 233 6299

Vanarapet North, Govindasalai (Upto Needarajappaiyar Street, Ambour Salai, Botanical Garden).
Assistant Engineer / Town-II
100, Perumal Koil Street
Puducherry
Phone Office: 233 6327
Phone Residence : 
(i) Fuse-off Call Office: Muthialpet
Phone: 223 6166

Muthialpet (Northern Border of Puducherry) and portion of Karuvadikuppam.

(ii) Fuse-off Call Office: Saram
Phone: 220 0776

Mohan Nagar, Ellapillaichavady, Saram, Pillaithottam, Kuyavarpalayam, Periyar Nagar,  Saradambal Nagar, portion of Kamaraj Salai.

(iii) Fuse-off Call Office: Venkata Nagar
Phone: 221 0361

Chellan Nagar, Kamarajar Nagar, Nehru Nagar, Chittankudisai, Brindavanam, Elango Nagar, Santhi Nagar, Rajarajeshwari Nagar, Chellan Nagar, Kamaraj Nagar, Nehru Nagar, Chithankudisai, Brindavanam, Elango Nagar, Santhi Nagar, Rajaji Nagar, Kumaragururpallam and portion of Kamarajar Street.
Assistant Engineer / Marapalam S.S
Sub-Station Campus
Cuddalore Road, Marapalam
Puducherry-605004
Phone :235 8547
(i) Fuse-off Call Office: Mudaliarpet
Phone: 235 7697

From Railway crossing at Cuddalore Road upto Murungapakkam Bridge, Thengaithittu portion and Uzhavarkrai South.

(ii) Fuse-Off Call Office: Town West
Phone: 220 3110

From Attupatti Anthoniar Koil junction upto Reddiarplayam from Karamanikuppam upto Ellaipillachavady.

(iii) Fuse -Off Call Office: Murungapakkam
Phone: 235 7362

Velrampet, Nagammal Nagar, Pudhu Nagar, Priyadharsni Nagar, NainarMandabam, Mookambigai Nagar, Thakka Thoppu, Murungapakkampet Papanchavadi, Ottenpalayam upto Kobakkampet.

Besides, if there happens to be any delay in services rendered by this Department, the public may approach the Executive engineer (Town) at the above mentioned address for redressal of their grievances.


EXECUTIVE ENGINEER-IV (NORTH)

ELECTRICITY DEPARTMENT
HEAD OFFICE CAMPUS
137, SUBBASH CHANDRA BOSE SALAI
Puducherry - 605 001
Telephone Office : (0413) 233 4279  Residence : 225 2286

The following Subdivision Offices and the respective jurisdictional areas under the control of Division-IV are as detailed  below. The public residing in the below mentioned area can approach their concerned Officers for availing of different services rendered by this Department. Besides the public may also contact the respective Fuse-off Call Office either in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Engineer / Lawspet
Electricity Department
1, Elango Street
Anandha Nagar
Kathirkamam
Puducherry-9
Phone Office: 227 3768
(i) Fuse-off Call Office : Lawspet
Phone : 225 3124

Karuvadikuppam, Lawspet, Pakkamudayanpet, Rajaji Nagar and Tagore Nagar.

(ii) Fuse-off Call Office: Ashok Nagar
Phone: 225 7100

Tagore Arts College Complex, Kurunji Nagar, Kumaran Nagar, Ashok Nagar, Chozan Nagar anf Government Servants Quarters.

(iii) Fuse-off Call Office:  Gorimedu
Phone: 224 8093

From Chain Factory up to Gorimedu (Puducherry Border), from Subbaiah Nagar to Kadirkamam and Thattanchavady.

Assistant Engineer / Kalapet
Sub-Station Campus
Kalapet, Puducherry
Phone Office: 265 5180
(i) Fuse-off Call Office : Kalapet
Phone : 265 5181

Kalapet, Chinnakalapet, Kanagachettikulam, Alankuppam including nearby villages.
Assistant Engineer / Kurumbapet
Sub-Station Camplex
PIPDIC Industrial Estate,
Kurumbapet, Puducherry
Phone Office: 227 5711
(i) Fuse-off Call Office : Muthirapalayam
Phone : 227 5744

Shanmugapuram, Muthirapalayam, Mettupalayam, PIPDIC Industrial Estate, Thakkakuttai, Oulgaret, Moolakulam and Pitchaveeranpet.
Assistant Engineer / Boomiyanpet
Boomiyanpet Housing Board Campus
Boomiyanpet
Puducherry
Phone Office: 220 0200
Phone Residence: 227 4218
(i) Fuse-off Call Office: Boomiyanpet
Phone: 220 5205

Vivekanantha Nagar, Victoria Nagar, Boomiyanpet Housing Board Campus, Agiz Nagar,Pavazhakaranchavady, Kamban Nagar, Jaya Nagar, Pudhu Nagar, Marial Nagar, Kaveri Nagar,portion of Oulgarpet, South Oulgaret, Moolakulam and portion of Pitchaveeranpet.

(ii) Fuse-off Call Office : Villianur
Phone : 266 6324

Arumparthapuram, Villianur, Odiampet and Kompakkam.
Assistant Engineer / Sedharapet
Electricity Department
Sub Station Campus
PIPDIC Industrial Estate
Sedharapet
Puducherry
Phone Office: 267 7390

(i) Fuse-off Call Office: Seduarpet
Phone: 267 7906

Sedharapet, Karasur, Sedharapet Industrial Estate.

(ii) Fuse-off Call Office : Ramanathapuram
Phone : 266 6374

Pathukannu, Ramanathapuram, Pillaiyarkuppam, Thuthipet, Thondamanathan, Koodapakkam.
Assistant Engineer / Thethampakkam
Electricity Department
Sub Station Campus
Thethampakkam
Puducherry
Phone Office: 267 4975

(i) Fuse-off Call Office:   Katterikuppam
Phone: 267 7898

Katterikuppam, Lingareddipalayam, Kumarapalayam, Suthukeni, Thethampakkam, Pudhukuppam, Sandaipudhukuppam, and Kuppam.

(ii) Fuse-off Call Office :  Thirukkanur
Phone : 268 8471

Mannadipet, Koonichampet, Thirukanur, Sorapet and Sellipet.

(iii) Fuse-off Call Office : Vadhanur
Phone : 268 0044

Vadhanur, Sorapet, Mannadipet, Vinayagampet, Sellipet, Vambupet, Puranasingapalayam.

Besides, if there happens to be any delay in services rendered by this Department, the public may approach the Executive engineer (North) at the above mentioned address for redressal of their grievances.


EXECUTIVE ENGINEER-IX (SOUTH)

MARAPALAM SUB–STATION CAMPUS
CUDDALORE ROAD, MARAPALAM
Puducherry-605 004
Telephone Office : 235 8564   Residence : 

The following Subdivision Offices and the respective jurisdictional areas under the control of Division are as detailed  below. The public residing in the below mentioned area can  approach their concerned Officers for availing types of services rendered by  this Department.  Besides the public may also contact the respective Fuse-off Call Office either in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Engineeer / Thirubuvanai
Thirubuvanai Sub - Station Campus
Villupruam Road
Puducherry
Phone Office: 264 1144
(i) Fuse-off Call Office : Thiruvandar Koil
Phone : 264 0149

Thiruvandar Koil, Madagadipet, Puranasingapalayam and Nallur.
Assistant Engineer / Eripakkam
Eripakkam Sub - Station Campus
Puducherry
Phone Office: 269 9494
(i) Fuse-off Call Office : Kariamanickam
Phone : 269 9448

Eripakkam, Madukarai and Kalmandapam.

(ii) Fuse-off Call Office : Karayamputhur
Phone : 269 8856

Kaduvanur, Manalmedu and Karayamputhur.
Assistant Engineer / Rural South
Marapalam Sub - Station Campus
Marapalam
Cuddalore Road
Puducherry - 605 004
Phone Office: 235 8564
(i) Fuse-off Call Office : Ariyankuppam
Phone : 260 0340

Ariyankuppam, Manaveli, Radhakrishna Nagar, Veerampattinam and Chinnaveerampattinam.

(ii) Fuse-off Call Office : Karikalampakkam
Phone : 266 6369

Karikalampakkam, Korkadu, Peranglore and Santhamangalam.

(iii) Fuse-off Call Office : Vadamangalam
Phone : 266 6606

Vadamangalam, Ariyur, Sivarandhagam, Uruvaiyar, Thirukanjee and Mangalam.
Assistant Engineer   / Bahour
Bahour Sub - Station Campus
Cuddalore Road, Kattukuppam
Puducherry
Phone Office: 261 1577
(i) Fuse-off Call Office : Bahour
Phone : 263 3444

Kanniakoil, Nirnayampet, Irulanchandai and Suruliankuppam.

(ii) Fuse-off Call Office : Kirumampakkam
Phone : 261 1129

Kirumampakkam, Mullodai, Pillaiyarkuppam and Pinachikuppam

(iii) Fuse-off Call Office : Thavalakuppam
Phone : 2618202

Thavalakuppam, Thennampalayam, Nallavadu, Korkamedu, Abizhegapakkam, T.N.Palayam and Andiyarpalayam.

Besides, if there happens to be any delay in services rendered by this Department, the public may approach the Executive Engineer (South) at the above mentioned address for redressal of their grievances.

SUPERINTENDING ENGINEER-I


EXECUTIVE ENGINEER-V (KARAIKAL)

7, KIRAMBUTHOTTAM SOUTH STREET
KARAIKAL
Telephone Office : 04368- 222 694 , Residence : 04398-222 684

The following Subdivision Offices and the respective jurisdictional areas under the control of Division are as detailed below. The public residing in the below mentioned area can approach their concerned Officers for availing types of services rendered by this Department. Besides the public may also contact the respective Fuse-off Call Office either  in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Engineer / Town
7, Kirambuthottam South Street
Karaikal
Phone Office:  04368 - 222 598
Phone Residence: 04368 - 226 599
(i) Fuse-off Call Office : Town
Phone :  04368 - 222 428

Whole Karaikal Town, Pudhuthurai, Darumapuram, Pachur and Thakkalur.

(ii) Fuse-off Call Office : Town North
Phone:  04368 - 230 798

Kovilpathu, Nehru Nagar, Thalatheru, Karaikalmedu, Kilinjalmedu, Ammankovilpathu, Pillaitheruvasal, Ammayar Nagar, Keezhakasakudi, Kottuchery, Kottucherimedu, Keezhakasakudimedu, Rayanpalayam, Koozkuditha, Pulianthippu, Varichikudi, Thiruvettakudi, Kalikuppam, Akkampet, Mandapathur, Kuppuchetty and Poovam.

(iii) Fuse-off Call Office : Thirumalairayanpattinam
Phone: 04368 - 234 492

Thirumalairayanpattinam, Polagam, Keezhavanjur, Melavanjur, Vadakkuvanjur, Mudalimedu and Pattinacherry.

(iv) Fuse-off Call Office : Neravy
Phone:04368 -  238 798

Vadakattalai, Nainikattalai, Padudarkollai, Melaiyurpettai, Idatheru, Neravy, Oozhipathu, Thootupona-moolai, Kakamozhi, Keezhamanai, Manjavazhipattu, Melaoduthurai, Keezhaodutharai, Naduoduthurai, Karukalacherry and Akkaraivattam.
Assistant Engineer / Rural
7, Kirambuthottam South Street
Karaikal
Phone Office: 04368 - 222 598
(i) Fuse-off Call Office : Thirunallar
Phone : 04368 - 236 674

Thirunallar, Athipadukai, Pettai, Sellur, Thennangudi, Agalankannu, Ilaingankudi, Surakudi, Karukkankudi, Thenur, Vizhithiyur and Manampettai.

(ii) Fuse-off Call Office : Ambagarathur
Phone: 04368 - 252 397

Ambagarathur, Thamanangudi, Kannapur, Nallazhundur, Nallambal, Kumarakudi, Chethur, Thenpidagai, Valathamangalam, Pandaaravadai, Vadaku Kottapady, Maadur and Moppayithangudi.

(iii) Fuse-off Call Office : Nedungadu
Phone: 04368 - 261 228

Nedungadu, Panchatcharam, Annavasal, Parutikudy, Agaramangudi, Kurumbagaram, Pandaaravaadai, Mathalankudi, Narikurumbai,Nallathur, Adaikalanpuram, Kottanpakkam, Saravanairuppu, Vadakattalai, Kulakudi, Anjur, Usuppar, Kottagam, Kilianur,Melakottucherry, Melakasakudi, Chembiankal, Thiruvenkatapuram,Devemauram, Chembiankal, Thiruvenkatapuram, Devemapuram,Pathakudi, Serumavilangai, Suppurayapuram and Keezhavur.

Besides, if there happens to be any delay in services rendered by this Department, the public may approach the Executive Engineer (Karaikal) at the above mentioned address for redressal of their grievances.

SUPERINTENDING ENGINEER-I


MAHE REGION

The Electricity Department provides the following services to the people of Mahe. According to their needs the public can approach the concerned Officer for availing the Services/Particulars in the Electricity Department.

(a) Availing of new service connection to domestic, commercial, industrial and Agriculture.
(b) Name transfer and shifting of service connection.
(c) Enhancement of  load.
(d) Rectification of defective meter.
(e) Change of tariff.
(f) Revision/correction of current consumption bill.
(g) Issue of Power Feasibility Certificate.
(h) Intimation of appropriate actions on the petitions received from the public.
(i) Hearing and redressal of public grievances and rectification of the complaint.

The Superintending Engineer-II is the overall incharge of the Mahe region and the Executive Engineer-III is looking after the Operation and Maintenance of the Mahe region, whose addresses are given below:

THE SUPERINTENDING ENGINEER-II
ELECTRICITY DEPARTMENT (MAIN OFFICE)
137, SUBBASH CHANDRA BOSE SALAI
Puducherry – 605 001
Telephone Office :0413 - 234 3687

THE EXECUTIVE ENGINEER-III
ELECTRICITY DEPARTMENT (MAIN OFFICE)
137, SUBBASH CHANDRA BOSE SALAI
Puducherry – 605 001
Tele. Off : 0413 - 233  8689

The Subdivision Officer and the respective jurisdictional areas under the control of the Sub divisional Officer are as detailed below. The public residing at the below mentioned area may approach their concerned officers for availing the Services / Particulars in the Electricity Department. Besides, the public may also contact the respective Fuse-off Call Office either in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Engineer / Mahe
Electricity Department
Main Road
Mahe
Phone Office: 0490 - 233 5666
(i) Fuse-off Call Office :   Mahe
Phone :  0490 - 233 2224

Whole  Mahe Town and Chembra Village.

(ii) Fuse-off Call Office: Palloor
Phone:  0490 - 233 2624

Palloor, Pandakkal, East Palloor, Chalakkara, Cherukallayui.

Besides, if there happens to be any delay in services rendered by this Department the public may approach the Executive Engineer-III at the above mentioned address for redressal of their grievances.


YANAM REGION

The Electricity Department provides the following services to the people of Yanam region. According to their needs the public can approach the concerned Officer for availing the Services / Particulars in the Electricity Department.

(a) Availing of new service connection to domestic, commercial, industrial and Agriculture.
(b) Name transfer and shifting of service connection.
(c) Enhancement of load.
(d) Rectification of defective meter.
(e) Change of tariff.
(f) Revision/correction of current consumption bill.
(g) Issue of Power Feasibility Certificate.
(h) Intimation of appropriate actions on the petitions received from the public.
(i) Hearing and redressal of public grievances and rectification of the complaint.

The Superintending Engineer-II is the overall incharge of the Yanam region and the Executive Engineer-VII is looking after the Operation and Maintenance of the Yanam region, whose addresses are given below:

THE SUPERINTENDING ENGINEER - II
ELECTRICITY DEPARTMENT (MAIN OFFICE)
137, SUBBASH CHANDRA BOSE SALAI
Puducherry – 605 001
Telephone Office : 0413 - 234 3687

THE EXECUTIVE ENGINEER - II
ELECTRICITY DEPARTMENT (MAIN OFFICE)
137, SUBBASH CHANDRA BOSE SALAI
Puducherry – 605 001
Tele Off : 0413- 222 5552

The Subdivision Officer and the respective jurisdictional areas under the control of the Sub divisional Officer, Yanam are as detailed below. The public residing at the below mentioned area can approach their concerned Officers for availing types of services rendered by this Department. Besides, the public may also contact the respective Fuse-off Call Office either in person or over phone for rectification of defects in supply of Electricity.

Officer

Areas

Assistant Engineer / Yanam
Electricity Department
No. 4-80, New Bus Stand
Yanam
Phone Office:0884 - 232 1278
(i) Fuse-off Call Office : Yanam
Phone : 0884 - 232 1278

Mettacura, Kanakalapeta, Kurusumpeta, Parampeta, Dommetivaripeta, Issukkalava, Seetharama Nagar, Darialathippa, Giriampeta, Savithri Nagar and Yanam Town.

Besides, if there happens to be any delay in services rendered by this Department, the public may approach the Executive Engineer-X at the above mentioned address for redressal of their grievances.

SUPERINTENDING ENGINEER-I


I PERMANENT SERVICE CONNECTION

 

I. Low Tension Service Connection (Domestic, Commercial, upto 10 kW)

i) Acknowledgement of receipt of service connection application along with required documents. - Within 1 day.
ii) Scrutiny of application, informing about the discrepancies in the application. - Within 5 days after receipt of application.
iii) ON LINE

a)

Preparation of estimate for extension of power supply to the service connection. - Within 5 days from the date of receipt of application in section office.

b)

Effecting service connection. - Within 7 days after payment of security deposit, service connection charges etc.
iv) MINOR EXTENSION

A)

Where distance is 200 m from the existing line:

a)

Preparation and Sanction of estimate for extension of power supply to the service connection. - Within 15 days from the date of receipt of application in section office.

b)

Execution of line works subject to availability of material and priority and site condition. - Within 15 days from the date of receipt of sanction

c)

Effecting service connection - Within 7 days after payment of security deposit, service connection charges etc.

B)

Where the distance is more than 200 m:

a)

Preparation and sanction of estimate for extension of power supply to the service connection. - Within 15 days from the date of receipt of application in section office.

b)

Execution of line works subject to availability of material and priority and site condition. - 20 days after receipt of sanction.

c)

Effecting Service Connection - Within 7 days after payment of security deposit, service connection charges etc.
CABLE
i) Acknowledgement of receipt of service connection application along with required documents. - Within 1 day
ii) Scrutiny of application, informing about the discrepancies in the application - Within 5 days after receipt of application.
iii) ON LINE

a)

Preparation of estimate for service connection application and extension of power supply to the service connection - Within 5 days from the date of receipt of application in section office.

b)

Effecting service connection - Within 10 days after payment of security deposit, service connection charges and obtaining permission from the municipality for road cutting.

II. Domestic and Commercial Services (Above 10 kW)

i) Acknowledgement of receipt of service connection application along with required documents. - Within 1 day
ii) Scrutiny of application, informing about the discrepancies in the application. - Within 5 days after receipt of application.
A) Schemes costing less than Rs.2,00,000:
a) Preparation and sanction of estimate for extension of power supply to the service connection - Within 45 days from the date of receipt of application in section office.
b) Execution of line works subject to availability of material and priority and site condition - 45 days after receipt of sanction
c) Effecting service connection - Within 10 days after payment of security deposit, service connection charges etc.
B) Schemes costing more than Rs.2,00,000:
a) Preparation and sanction of estimate for extension of power supply to the service connection. - Within 60 days from the date of receipt of application in section office.
b) Execution of line works subject to availability of material and priority and site condition. - 75 days after receipt of sanction.
c) Effecting service connection - Within 10 days after payment of security deposit, service connection charges etc.

III. Low Tension Industries upto 5 H.P.

i) Acknowledgement of receipt of service connection application along with required documents. - Within 1 day
ii) Scrutiny of application, informing about the discrepancies in the application. - Within 7 days after receipt of application.
iii) Preparation and sanction of estimate for extension of power supply to the service connection. - Within 10 days from the date of receipt of application in section office.
iv) Effecting service connection - Within 7 days after payment of security deposit, service connection charges etc.

IV. Low Tension Industries above 5 H.P

a) Acknowledgement of receipt of service connection application along with required documents. - Within 1 day
b) Scrutiny of application, informing about the discrepancies in the application. - Within 7 days after receipt of application.
A) Schemes costing less than Rs.2,00,000:
a) Preparation and sanction of estimate for extension of power supply to the service connection - Within 45 days from the date of receipt of application in section office.
b) Execution of line works subject to availability of material and priority and site condition. - 45 days after receipt of sanction.
c) Effecting service connection after payment, after fixing the meter at the consumer premises. - Within 10 days after payment of security deposit.
B) Schemes costing more than Rs.2,00,000:
a) Preparation and sanction of estimate for extension of power supply to the service connection. - Within 60 days from the date of receipt of application in section office.
b) Execution of line works subject to availability of material and priority and site condition. - 75 days after receipt of sanction.
c) Effecting service connection after payment, after fixing the meter at the consumer premises. - Within 10 days after payment of security deposit.

V. High Tension Industries

i) Acknowledgement of receipt of service connection application along with required documents. - Within 3 days
ii) Scrutiny of application, informing about the discrepancies in the application. - Within 7 days after receipt of application.

A)

Schemes costing less than Rs.2,00,000:
a) Preparation of estimate and sanction for extension of power supply. - Within 30 days from the date of receipt of application in section office.
b) Collection of Security Deposit and execution of agreement. - Within 7 days from the date of sanction if applicant is ready.
c) Execution of HT line extension, Double Pole structure works subject to availability of materials, priority and site condition. - Within 30 days after payment of Security Deposit.
d) Provision of metering arrangements - 10 days after completion of work.
e) Effecting service connection after payment, after fixing the meter at the consumer premises. - Within 10 days after completion report with all the required clearances by the applicant.
B) Schemes costing more than Rs.2,00,000 but less than Rs.5,00,000:
a) Preparation of estimate for extension of power supply. - Within 30 days from the receipt of application in section office.
b) Collection of Security Deposit and execution of agreement. - Within 7 days from the date of sanction if applicant is ready.
c) Execution of HT line extension, Double Pole structure works subject to availability of materials, priority and site condition. - Within 60 days after payment of Security Deposit.
d) Provision of metering arrangements - 10 days after completion of work.
e) Effecting service connection after payment, after fixing the meter at the consumer premises. - Within 10 days after completion report with all the required clearances by the applicant.
C) Schemes costing more than Rs.5,00,000:
a) Preparation of estimate for extension of power supply. - Within 30 days from the date of receipt of application in section office.
b) Collection of Security Deposit and execution of agreement. - Within 7 days from the date of sanction if applicant is ready.
c)
i) Execution of HT line extension, Double Pole structure works subject to availability of materials, priority and site condition (without erection of new feeder).

-

Within 90 days after payment of Security Deposit.
ii) Extension of line work involving provision of new / additional feeder arrangement from the sub-station. - Within 180 days after payment of security deposit
d) Provision of metering arrangements - 10 days after completion of work.
e) Effecting service connection after payment, after fixing the meter at the consumer premises - Within 10 days after completion report with all the required clearances by the applicant.

NOTE:  In the case of outlying regions, if sanctions are required from Puducherry another 15 days  time may be added to the time indicated under each category.


II. ISSUE OF POWER FEASIBILITY CERTIFICATE

(A)

LOW TENSION SERVICE CONNECTION:

(i) If the total load in addition to the proposed load is within  90% of the capacity of existing transformer and the scheme; proves  to be self-remunerative. -

Power Feasibility Certificate will be issued within 10 days after receipt of the application.

(ii) If the total load in addition to the proposed load is more than 90% of the capacity of existing transformer. - Will be issued within 30 days after receiving the application.

(B)

HIGH TENSION SERVICE CONNECTION:

(i) If the contracted maximum demand is less than 500 KVA. - Within 30 days after submitting all the necessary documents.
(ii) If the contracted maximum demand is including or more than 500 KVA. - After submitting all the necessary documents within20 days after obtaining the Government sanction.



III OTHER WORKS

(i) Rectification of Fuse-off Call Complaints at the Consumer end. -

Immediately

(ii) Rectification of High tension Power interruption. -

Immediately, if possible defect will be attended on the same day. If the defect prevails, the same will be rectified on the next day.

(iii) Fault rectification in distribution transformer. -

Will be rectified within three days. If the capacity of other nearest transformer is adequate, supply will be extended  through alternate line on the same day, if feasible.

SUPERINTENDING ENGINEER - I


APPLICATION FOR NEW DOMESTIC SERVICE CONNECTION-LOW TENSION

CHECK LIST OF DOCUMENTS

SL No

Details

Enclosed Not Applicable Remarks
1 Application Form  duly filled up Yes No
2 Attested copy of the registered ownership document or registered lease agreement with No Objection Certificate of the property Owner. Yes No
3 Power Feasibility Certificate for multistoreyed buildings with connected load exceeding 25 kW. Yes No
4 Puducherry Planning Authority approval for multistoreyed buildings as required under clause 16 of the departmental terms and conditions of supply of electricity. Yes No
5 For cases with Door No., Street Name not identified in ownership Document, Affidavit declaring that the premises for which the connection is sought is same as in the ownership document. Yes No
6 Certificate from the electrical contractor confirming use of ISI certified materials and equipments only, in the building electrification. Yes No
7 Copy of the Occupancy certificate for servicing of multistoreyed building installations. Yes No
8 2 Self addressed  stamped envelopes. Yes No

Note:

For enhancement of load under the existing policies, all the above particulars along with copy of the latest Current Consumption Bill and Payment Receipt should be submitted.


APPLICATION FOR NEW COMMERCIAL SERVICE CONNECTIONS-LIGHTING AND AIR-CONDITION LOAD

CHECK LIST OF DOCUMENTS

SL No Details Enclosed Not Applicable Remarks
1 Application Form  duly filled up. Yes No
2 Attested copy of the registered ownership document or registered lease agreement, with No Objection Certificate of the property Owner. Yes No
3 Power Feasibility Certificate for load exceeding 10 kW Yes No
4 Puducherry Planning Authority Approval for multistoreyed buildings as required under clause 16 of the Departmental Terms and Conditions of Supply of Electricity (or) No Object Certificate / Sanction Plan issued by Competent Authority (PPA). Yes No
5 For cases with Door No., Street Name not identified in ownership document, affidavit declaring that the premises for which the connection is sought is same as in the ownership document. Yes No
6 Certificate from the electrical contractor confirming use of ISI certified materials and equipments only, in the building electrification. Yes No
7 Copy of the Occupancy Certificate for servicing of multistoreyed building installations . Yes No
8 Two Self Addressed Stamped envelopes Yes No

Note:

(A) For enhancement of load under the existing polices, all the above particulars along with copy of the latest Current Consumption Bill and Payment Receipt should be submitted.

(B) Separate Application to be filed for Lighting load and Air-Condition load.


APPLICATION FOR NEW LT INDUSTRIAL SERVICE CONNECTION

CHECK LIST OF DOCUMENTS

SL No Details Enclosed Not Applicable Remarks
1 Application Form with signature and seal. Yes No
2 Attested copy of Registered Ownership Document. Yes No
3 Attested Copy of valid Power feasibility certificate. Yes No
4 Attested copy of approval from Puducherry Planning Authority  with a Copy of Approved plan. In case of existing building, NOC should be enclosed. Yes No
5 Attested copy of SSI Provisional Certificate. Yes No
6 In case of partnership firm Registered Partnership Deed  should be enclosed (or) Certificate of registration issued by the Registrar of Companies. Yes No
7 In case of Company, Memorandum and Article of Association and Certificate of Incorporation should be enclosed. Yes No
8 In case of Partnership / Company, letter for Authorised Signatory to deal with matters related to Electricity Department. Yes No
9 Attested Copy of Valid Commune Panchayat Licence / Permission with permitted load mentioned. Yes No
10 Attested Copy of Valid NOC / consent order, Puducherry Pollution Control Committee for Air and Water. Yes No
11 Attested copy of Valid approval / licence from inspector of factories Department with copy of approved plan Yes No
12 Attested copy of state ground water unit clearance for ground water utilization if the industry is water based Yes No
13 Details of machineries with capacity to be installed. Yes No
14 Peak Hour load restriction undertaking Yes No
15 Certificate  from the Electrical contractor confirming use of ISI certified materials and equipments only, in the building electrification work. Yes No
16 Two Self Addressed Stamped envelopes Yes No

Note:

For enhancement of load under the existing policies, all the above particulars along with copy of the latest Current Consumption Bill and Payment Receipt should be submitted


APPLICATION FOR  HT INDUSTRIES

CHECK LIST OF DOCUMENTS

SL No Details Enclosed Not Applicable Remarks
1 Application Form with signature and seal (7 copies). Yes No
2 Sale Deed/Registered Lease Deed / PIPDIC allotment order (2 copies) Yes No
3 Power feasibility certificate (3 copies) Yes No
4 Puducherry Planning Authority‘s approval(3 copies) Yes No
5 Provisional registration certificate from Industries Department, Puducherry ( 3 copies) Yes No
6 Registered partnership deed (3 copies) Yes No
7 In case of Company, Memorandum of Article of Association and certificate of incorporation (2 copies) Yes No
8 Power of attorney to sign the HT application (3 copies) Yes No
9 Commune Panchayat Licence / permission (3 copies) Yes No
10 Clearance from Department of Science and Technology and Environment (3 copies) Yes No
11 Clearance from inspector of factories and Boilers (3 copies) Yes No
12 Clearance from State Ground water unit / Agricultural Department if the industry is water based (3 copies) Yes No
13 Details of Machineries with capacity to be installed Yes No
14 Peak Hour Demand Restriction undertaking letter Yes No
15 Concurrence letter from the applicant in case of HT to near the cost of 50% of the cost towards erection and extension of lines over and above  1 lakh (3 copies) Yes No
16 Site layout (3 copies) Yes No
17 No due certificate in case of enhancement Yes No
18 Two Self Addressed Stamped envelopes Yes No


APPLICATION FOR NEW LT IRRIGATION PUMP SET  (AGRICULTURAL SERVICE CONNECTION)

CHECK LIST OF DOCUMENTS

SL  No Details Enclosed Not Applicable Remarks
1 Application Form 2 duly filled up. Yes No
2 Attested copy of the registered ownership document or registered lease agreement, with No Objection Certificate of the property owner. Yes No
3 In case the water is drawn from river/ channel/sub-channel Nallah, etc, by installing pumpset the copy of the NOC from the concerned irrigation department, Public Work Department or Revenue Department or any other department to lift water shall be submitted. Yes No
4 In case under ground water is tapped copy of the attested clearance certificate issued from the State ground water unit. Yes No
5 Certificate of ownership authenticated by the authorised Revenue official of that area and in case there are more than one person who are owners of the well, the consent letter from other owners. Yes No
6 Certificate from the electrical contractor confirming use of ISI certified materials and equipments only and compliance on energy conservation measures, in installing agricultural pumpsets. Yes No
7 Two Self Addressed Stamped envelopes. Yes No

Note:

For enhancement of load under the existing policies, all the above particulars along with copy of the latest Current Consumption Bill and Payment Receipt should be submitted.


Back to INDEX Page Back to HOME Page